New app in the AIC:

1625743441772.png


Aerial of existing site:

1625744040044.png


Streetview:

1625744093242.png
 
This site is currently an unofficial dump and is disgusting.
This area will eventually be served by the EglintonE LRT and is currently served by the BRT. I’d like to see some more height, but there is a school nearby that may make it difficult to add more height due to shadowing.
 
Site Plan Approval application filed:

4566-4568 KINGSTON RD
Ward 25: Scarborough-Rouge Park


Proposal for a 12-storey mixed use building (37.3 metres) with commercial on the ground floor and residential above, containing 131 residential units. The total gross floor area would be 9,599.98 square metres
 
Site Plan Approval application filed:

4566-4568 KINGSTON RD
Ward 25: Scarborough-Rouge Park


Appears to have dropped a floor at some point, I will adjust the title accordingly.

@Art Tsai may wish to make note of that change.
 
New renderings are updated in the database. The project information updates also. The total storey count changed from 13 storeys to 12 storeys. The total building height changed from 45.30m to 37.30m. Total unit counts were reduced from 137 to 131 units. Finally, the total parking spaces were reduced from 138 parking to 129 parking.

The renderings are taken from the architectural plan via the Rezoning application:

PLN - Architectural Plans - APR 29  2022-1.jpg


PLN - Architectural Plans - APR 29  2022-1a.jpg


PLN - Architectural Plans - APR 29  2022-1b.jpg


PLN - Architectural Plans - APR 29  2022-1c.jpg
 
The height changed from 37.30m to 42.3m. No new renderings are updated in the database.
 
This site is currently an unofficial dump and is disgusting.
This area will eventually be served by the EglintonE LRT and is currently served by the BRT. I’d like to see some more height, but there is a school nearby that may make it difficult to add more height due to shadowing.
The Eglinton East LRT won't happen for another decade, and it will be a decade late and a billion over budget like the Eglinton crosstown. . Doug Ford has no interest in it since it doesn't involve highways of the downtown core.
 
Decision Report - Approval Recommended to the next meeting of SCC:


This one has had some revisions, the 12s height is already reflected in the thread title.

This one had new submission materials in Dec '23.

From the Report:

1707144457313.png


Render with Dec. Docs:

1707144592095.png


The Dec' 23 landscape plans do not match the description in the report.

@Paclo is flagged.
 