AndreaPalladio
Senior Member
I saw that. I assumed the movie or commercial they were shooting was French, as the signs on the tree lot said Sapin de Noel.
Tender call is finally out - work is supposed to start immediately after Para-Pan-Am Games:
Really looking forward to this, between it and the North Market the area will be getting a significant boost.
AoD
If you are asking about Berczy the work will start ASAP after PAG and most will be completed by winter. I would assume that plantings may not happen until spring 2016.What's the anticipated completion date?
Thanks for the update DSC - is there an update on the district lighting plan?
AoD
The Heritage Lighting Master Plan for St Lawrence is still being implemented as opportunities arise. See: http://www1.toronto.ca/city_of_toronto/city_planning/urban_design/files/pdf/hert_final_report.pdf
As usual, Toronto Hydro are not being helpful and now do not see that implementing it is anything to do with them! Last fall the street lighting on Lower Sherbourne was improved and heritage lights with buried wiring was installed. There continues to be hope that St James Cathedral will finally be properly lit - possibly as the St James Park work proceeds.
Actually the current Dean is very supportive of it, maybe a donor will spring for "memorial lighting"??I'm told the Dean has announced his retirement (again) so maybe his replacement will be able to shake down some donors to pay to light the cathedral.
Have you not seen these wonderful heritage lights sitting with cracked bases lying across the sidewalk whenever a car bumper touches them. A dozen missing along Front. They have no replacements. Bases covering bolts at street level missing. It's a disgrace. Bolts are so terribly undersized. What were they thinking. Typical of anything in Pam ' ward. Like those awful tree wells along the esplanade west of church that have become garbage receptacles. Complained to her office. Silence.