Application to :"Lift the H" has been filed with the City.

Cover Letter:

1692698168519.png


1692698216681.png
1692698243000.png


1692698274016.png


Letter dated July 24, 2023; circulated publicly August 3rd, 2023.
 
Looks like they may being trying to start demolition on this before winter. Most of the commercial units are now empty.

The kitchen hub has closed.
The dulux paint has moved.
The salon has closed.
The denture place appears to be closed.
the Barber was still open as of yesterday.
 
Sales centre is onsite, in the old Dulux location. Building has partially been painted pink. Will try and snap a photo if I'm by in the daylight.

Edit. Wasn't a sales centre. They simply painted the building and branded the outside to advertise the future project. Sign outside directed to sales centre on Bloor.
 
Last edited:
I wonder what the concrete pipes are for. Are they replacing the water mains on street level too?
They are. Queensway is partially closed on the south side at canmotor, and canmotor is closed to southbound traffic. They've been replacing water mains and supplies and such
 
Hmm, 138 spots for 210 Tenants, down from ~195 spots. I don't think the parking sold well. Mattamy was asking 70K for a spot with another $840 a year in maintenance fees. 😳
 

Back
Top