The podium is set back on the north and east side for the top two floors. Window washing anchors stored one floor below - ready for install.
Garage ramp - Looks like insulation, ramp heater and then a final top layer for the ramp coming next?
Looking forward to seeing more steel on the south side over the tracks….and the bridge over Yonge.
More windows waiting to be installed. You can see the machine that lifts windows that looks like a spider. The cladding, has been installing, and we’re blasting through, that it’s becoming jaw dropping. Uhhh.. let’s move on.