They are moving on this quickly:cool:..........Toronto Committee of Adjustment/January 14, 2015 p.m.

25B. 45R BAY ST (RAIL CORRIDOR)

File Number: A1040/14TEY Zoning T (ZPR)
Ward: Toronto Centre-Rosedale (28)
Property Address: 45R BAY ST
(RAIL CORRIDOR)
Community: Toronto
Legal Description: PLAN 655E PT BLK 6 RP 64R15016 PART 1 PLAN 12164 PT LOT 18 RP
66R24072 PARTS 1 AND 2
PURPOSE OF THE APPLICATION:
To construct a park above the rail corridor on the east side of Bay Street.
REQUESTED VARIANCE(S) TO THE ZONING BY-LAW:

1. Section 7(1), By-law 168-93
A "Rail Overbuild Park" is not a permitted use.
In this case, a "Rail Overbuild Park" will be built.

2. Section 4(3)(a), By-law 168-93
No person shall erect or use a building on the lot with any portion of the roof of such building having a
greater height in meters than 15.0 m above grade.
In this case, the height of the "Rail Overbuild Park" will be 29.02 m above grade.


25C. 141 BAY ST

File Number: A1041/14TEY Zoning T & h(CR) (Waiver)
Ward: Toronto Centre-Rosedale (28)
Property Address: 141 BAY ST Community: Toronto
Legal Description: PLAN 12164 PT LOTS 12 TO 14 RP 64R16698 PARTS 1 TO 4
PURPOSE OF THE APPLICATION:
To construct a four-storey entry building with elevator access to the elevated open space, Bay East Teamway
and Platform 1.
REQUESTED VARIANCE(S) TO THE ZONING BY-LAW:

1. Section 4(3)(a), By-law 168-93
No person shall erect or use a building on a lot with any portion of the roof of such building having a
greater height in metres above grade than 15.0 m.
In this case, the height of the 'north portal' pedestrian walkway will be 24.45 m.

2. Section 6(1), By-law 168-93
A surface parking lot is not a permitted use in a CR district.
In this case, a surface parking lot is permitted


http://www1.toronto.ca/City Of Toro...f/C/C of A TEY Agenda January 14, 2015 PM.pdf
 
What's this mention of a surface parking lot ?
 
What's this mention of a surface parking lot ?

I believe a surface parking lot on the north side until the commence of Phase-2

Also more on the bldg. itself, Phase-1...............http://www1.toronto.ca/City Of Toro...f/C/C of A TEY Agenda January 14, 2015 PM.pdf

25A. 45 BAY ST
File Number: A1039/14TEY Zoning CR & h(CR) (Waiver)
Ward: Toronto Centre-Rosedale (28)
Property Address: 45 BAY ST Community: Toronto
Legal Description: PLAN 655E PT BLK 6 RP 64R15016 PART 1 PLAN 12164 PT LOT 18 RP 66R24072
PARTS 1 AND 2
PURPOSE OF THE APPLICATION:
To construct a 48-storey office building with a bus terminal at street level integrated into the podium of the
building and access to an open space area bridging the rail corridor to the north.
 
The surface parking lot would replace the current bus terminal once it moves into the podium of 45 Bay. Surface parking would disappear when 141 Bay get developed…

if the surface lot is approved.

42
 
The surface parking lot would replace the current bus terminal once it moves into the podium of 45 Bay. Surface parking would disappear when 141 Bay get developed…

if the surface lot is approved.

42
I suspect the temporary surface parking lot will be approved (maybe for a fixed period) but it is far smaller than the existing 'bus parking lot' it will replace and the rest of the area will apparently be landscaped. Let's hope that once 45 Bay is underway and the buses move into it the market will be stronga nd encourage a speedy start for the 141 Bay phase.
 
I hope they also have some lighting going up along the building as well. Possibly outlining the diamond shapes along the outside.
 