• Thread starter Suicidal Gingerbread Man
  • Start date
Were you up at 360? I went there for my 13th birthday and it was a spectacular experience.
Though the food has not been as good since covid, the 360 is a great place to take visitors as you not only get a decent meal you get priority access to the Tower itself and by-pass the worst lines. We now almost always take our out-of-town visitors there.
 
IMG_6279.JPG


 
The steel skeleton is starting to get towards the top of the core Wonder if we will see the climbing frame be taken down in the next few weeks
Clearly its time is coming to an end as the building's climbing days are over. I bet it is dismantled in the next 2 weeks so that the steel can continue to ITS top.
 
The last 3 floors of office steel are starting to be bolted together. 48-50
The East roof at 51 could top out this month.
The West side has 3 mechanical floors to go above 50.
The rail climbings system is almost removed.
The podium mechanical equipment seems to be in place and the podium roof is being closed in.
The extra hoist from the podium roof is being prepared for the increase in tenant construction workers..

IMG_6902.jpeg


IMG_6900.jpeg


IMG_5009.jpeg


IMG_6895.jpeg


IMG_6901.jpeg


IMG_6898.jpeg


IMG_6897.jpeg
 

Back
Top