• Thread starter Suicidal Gingerbread Man
  • Start date
The park is decorated beautifully, I can’t wait for the other half to open!
You_Doodle+_2024-11-24T00_33_14Z.jpeg
 
Does anyone know if the north tower will be connected underground to the TTC/Union station? Wondering if I will be able to get off the GO Bus at the new terminal and walk down stairs to a tunnel vs the long way over the bridge.
 

Back
Top