Photos taken Sept 5th, 2022:

Getting deeper under the north facade:

DSC09415.JPG


DSC09414.JPG
 
Says 'elevation drawings'.

The Application Information Centre is always infuriating (I think I need to have tea 🫖 with @Northern Light and discuss how he navigates this maze of dead ends).

A search for a number of the Concord Sky addresses (391, 383 etc.) yields:

a) the 2019 KPF elevations (SPA for the previous plan - full colour but no heights).

b) 391 Yonge Street - February 13, 2020 - partial permit - foundation (no documents). Using various other filters for 391 Yonge, results in the dreaded "I can't find stuff" 🎡 spinning wheel (no results).

The only recent reference to Concord Sky height (still at 298.99 metres) I could find was in the image below from the June 2022 docs for 399 Yonge Street.

399-Yonge+Concord-Sky.jpg

https://secure.toronto.ca/AIC/index.do#detail0

Deleted: (had a brain fart and mixed up Phase 1 and Phase 3)
 
Last edited:
The Application Information Centre is always infuriating (I think I need to have tea 🫖 with @Northern Light and discuss how he navigates this maze of dead ends).

A search for a number of the Concord Sky addresses (391, 383 etc.) yields:

a) the 2019 KPF elevations (SPA for the previous plan - full colour but no heights).

b) 391 Yonge Street - February 13, 2020 - partial permit - foundation (no documents). Using various other filters for 391 Yonge, results in the dreaded "I can't find stuff" 🎡 spinning wheel (no results).

The only recent reference to Concord Sky height (still at 298.99 metres) I could find was in the image below from the June 2022 docs for 399 Yonge Street.

View attachment 432186
https://secure.toronto.ca/AIC/index.do#detail0

On a side note, I stumbled across a 2 year old Pinnacle One Yonge Phase 3 application:

September 16, 2020 - 65 Storeys - new building - 1-7 Yonge - under review (no docs... of course!)

The most recent plan in the AIC dates from Dec' 19.

I read the height at 299.0:

1665584802112.png
 

Back
Top