I assume the aim is top out Block 5A by the end of the year before the snow starts which seems doable. 23 floors in 7 months.

Podium 4/4 floors (100%)
Midrise 4/9 Floors (44%)
High Rise 4/27 Floors (15%)
Interesting calculation. Not sure (not an architect or engineer) but I assume the high rise part might go faster as the podium and midrise Covered more area? I guess we can guesstimate once it reaches floor 10 and 11?
 
Interesting calculation. Not sure (not an architect or engineer) but I assume the high rise part might go faster as the podium and midrise Covered more area? I guess we can guesstimate once it reaches floor 10 and 11?
Usually the rule of thumb is 1-1.5 floor a week on average. With 23 floors left to go that is about 30-35 weeks aka 8 ish months
 