Richard White
Senior Member
Despite that, it doesn't stop the fact the line will inevitably get delayed thanks to the central section. I'd be very surprised if the line opened on time.
Perhaps it will open in 2035?
|
|
|
Despite that, it doesn't stop the fact the line will inevitably get delayed thanks to the central section. I'd be very surprised if the line opened on time.
Isn't it really strange they are placing rubber pads bolted onto concrete blocks on surface tracks? It seems pretty clear that they aren't going to pour concrete on top.
Looks like a possible green track installation or even just leave it as-is so cars don't drive on it into the tunnel.
Based on what I see at Leslie, the guideway will not be level with the road everywhere Along the surface portion. Elsewhere there is a curb about double the height of a sidewalk. I doubt anyone without a Hummer is going to drive on it.Isn't it really strange they are placing rubber pads bolted onto concrete blocks on surface tracks? It seems pretty clear that they aren't going to pour concrete on top.
Looks like a possible green track installation or even just leave it as-is so cars don't drive on it into the tunnel.
I agree totally and that is a positive thought for a Saturday.
It teases the completion of Mount Dennis station. Would be nice to visit it for Doors Open.
Metrolinx has finally admitted that the opening of this line is now delayed well into 2022.
Eglinton Crosstown faces another setback, delayed until 2022
Metrolinx attributes the delay largely to Crosslinx Transit Solutions (CTS), the private consortium building the LRT, for achieving ‘only 84 per cent of its target, meaning the project will be delayed.’www.thestar.com
Metrolinx has finally admitted that the opening of this line is now delayed well into 2022.
Eglinton Crosstown faces another setback, delayed until 2022
Metrolinx attributes the delay largely to Crosslinx Transit Solutions (CTS), the private consortium building the LRT, for achieving ‘only 84 per cent of its target, meaning the project will be delayed.’www.thestar.com
No firm date set for completion.
Exclusive: Eglinton Crosstown LRT delayed until 2022, Metrolinx confirms.
https://www.thestar.com/news/gta/20...faces-another-setback-delayed-until-2022.html