Build Up
Active Member
lol nice tryHere's a good one: maybe we can use a TARP to cover the stumps. Get it? TARP, as in the bailout money? Ehh, never mind. That's not very good at all.
lol nice tryHere's a good one: maybe we can use a TARP to cover the stumps. Get it? TARP, as in the bailout money? Ehh, never mind. That's not very good at all.
SNF, The reason it usually takes longer to build ground level, is that floor is usually at least double hieght around 6m, so wall forms have to be staked one on to of the other more steel goes into them takes much longer to set up to received concreate. plus there often is a transfer beams on the ground floor.
And if temperature being below -10 and showing, union guys don't have to report to work.
And if temperature being below -10 and showing, union guys don't have to report to work.