IIRC one of the phases of sugar wharf or pinnacle one Yonge has a vertically integrated school as well
Sugar Wharf phase 2 will have a school. Pinnacle One Yonge gets a community centre first.

42
 
Yesterday:
20181004_232029.jpg
 

Attachments

  • 20181004_232029.jpg
    20181004_232029.jpg
    170.3 KB · Views: 635
Looks great. I very much like the indented 'terrace' and west side entry. Lovely street presence.
 
I must say this has turned out far better than I expected in the renderings. Too bad the project across the street isn't up to the same standard.
 
I just hope the retail lane between the office buildings and the residential towers won't be too dark from shadows.
 
Yesterday while getting groceries at Loblaws, we observed the antics of installing a curtain wall panel. It looked to me the panel wasn’t aligned to the anchor. The installer at the bottom level was using his might to wiggle it in place, that’s an understatement, it could have been a football play on the front line. I thought there is a 200lb+ man wrestling with a 400lb panel. Yet it went in place in just a few tries, amazing.
 

Back
Top