This thread will be used for phase 1, the currently under-construction 26-storey tower.

Updated renderings of Phase 1:
R3_Architectural Drawings (1)-0.jpg
R3_Architectural Drawings (1)-129.jpg
R3_Architectural Drawings (1)-130.jpg
R3_Architectural Drawings (1)-131.jpg


For Duo Condos Phase 2, please see this page and thread.
 
Last edited:
The street level is looking pretty good for being on an eight lane traffic sewer. But the only retail going in right now is yet another dental clinic.

IMG_8968.jpeg
IMG_8971.jpeg
 

Back
Top