The top of the Uniqlo scaffolding does still bizarrely have written, "Located on the 3rd Floor, Dundas Atrium"...
 
It's interesting that on the hoarding it says Uniqlo is going on the 3rd floor of the Eaton Centre. I'm not sure what that means at this end of the mall.
 
Level 3 is ground level at the north end. Level 2 is ground level at the south end. Level 1 is PATH level at the south end. The Urban Eatery at the north end is considered to be on the Concourse Level.

42
 
An update to the store itself:

-The 3rd floor restaurant that overlooks the the Eaton Centre is essentially completed
-The interior is still undergoing some electrical work but i'd say it is about 90% complete
-Products wont be moving into the store until at least mid-August (depending on how much work is left to be done)
-The Dundas street portion around the entrance is quite unfinished compared to the rest of the store
 