The transition between elevated line across the Humber River / Eglinton Flats, and the short tunneled section connecting to Mount Dennis station will go here.

I believe this tunnel is going to be mined to Mount Dennis station. Too short of a section to bore and no way to pull the TBMs out at the other side.
 
I believe this tunnel is going to be mined to Mount Dennis station. Too short of a section to bore and no way to pull the TBMs out at the other side.
Yup that's correct, or more technically Sequential Excavation:

 
11 and 13 Hollis Street to be torn down for a "laydown area" for the Eglinton West LRT extension's tunnel construction.

15 Hollis Street is the location for a 48 story, 583 unit condo development. So that's why 11 and 13 were not bought by Gairloch Developments. See https://urbantoronto.ca/database/projects/15-hollis.45655 . Wonder if after the construction, what will happen to the property? A park?

1725987043466.png
 
Wonder if after the construction, what will happen to the property? A park?
Read the notice in the post above yours:

The owner (Hollis Dev LP ) of 11- 23 Hollis Street has submitted a site planapproval application and a zoning by-law amendment ( 21 177934 WET 05 OZ) on June30, 2021 for a Proposed 48-storey residential building, comprising of a 6-storey basebuilding with a 42-storey tower. The building will include a total of 583 dwelling units,103 car parking spaces in three levels of underground parking, 585 bicycle parkingspaces and a gross floor area (GFA) of 39,217 square metres, resulting in a density of17.6 FSI. The applicant is progressing through the development approval process.
AFAIK Mx is just leasing the land from the developer during construction.
 
Last edited:
New RFP launched for the "Stations, Rail and Systems (SRS) package".

If it were me, i'd disqualify WestEx since they involve 2 firms with the current Crosstown mess (Aecon, and AtkinsRéalis -aka SNC Lavalin), and Trillium Rail since it involves the walking disaster firm known as Acciona.

That's unless of course, Metrolinx wants the Crosstown West to be delayed as well.
 
New RFP launched for the "Stations, Rail and Systems (SRS) package".


Metrolinx version:

The package of work includes design and construction of all seven new stations, fitting the tunnels and 1.5-kilometre elevated guideway with track and signals, and installing and commissioning communications, ventilation and other support systems for the new line.
The contract also includes utility work and road modifications along Eglinton Avenue West to accommodate construction and changes at Mount Dennis Station that will help connect the extension to future Eglinton Crosstown LRT service.
After the proposals are evaluated, Metrolinx and Infrastructure Ontario will select a partner to work with over an 18-month development phase to further refine design, costs and project schedules. Metrolinx will then have the option to sign a final agreement with the proponent.
 
In honour of that RFP being issued: an update on the Scarlett Portal:
Tunnel wall construction continues and (not in photos as there were workers whose faces would be in the picture)) the walls of the actual portal are nearly finished
20240928_115304.jpg

And in this photo you can see the little detail on the headwall of the portal, behind the crane's operate cab
20240928_115102.jpg
 
New RFP launched for the "Stations, Rail and Systems (SRS) package".

Great! Now they can remove all the sod they just laid down at the station locations for no reason whatsoever!
 
If it were me, i'd disqualify WestEx since they involve 2 firms with the current Crosstown mess (Aecon, and AtkinsRéalis -aka SNC Lavalin), and Trillium Rail since it involves the walking disaster firm known as Acciona.

That's unless of course, Metrolinx wants the Crosstown West to be delayed as well.
Bad news, the existing tunneling contract is being handled by Aecon and Dragados, so they have a huge cost advantage here. I'd honestly be surprised if they're not picked.
 