Earlier Today

20210122_104013.jpg
 
Feb 03/21
Once Lions crews finish removing asbestos material, the building is comes down. 75% of the area is fence off with 4 wrecking machines on site.

It will mean I will not be able to shoot from the north side anymore until the old school is down and site clear.

2022 is more looking like an opening day for the school.

Truck load of joist on site for the roof.
51007034682_5f29807e93_b.jpg

51006929851_18e6555113_b.jpg

51006223298_d27cbb9950_b.jpg

51006931231_12ea331e75_b.jpg

51007036542_222e419bee_b.jpg

51006223878_2e5fee144f_b.jpg

51006931886_e1ab7437df_b.jpg

51007037412_37f3f804b4_b.jpg

51006225128_910ffc4112_b.jpg

51006225683_ea1a5083fc_b.jpg

51006226193_baf258c0f3_b.jpg

51006934036_1459eacb9e_b.jpg

51006226323_719ee6ba71_b.jpg

51006226363_9560e40438_b.jpg

51006226413_ebc70dfb4f_b.jpg

51006226503_8a21c3fa64_b.jpg

51006934501_f159988693_b.jpg
 
Feb 03/21
Once Lions crews finish removing asbestos material, the building is comes down. 75% of the area is fence off with 4 wrecking machines on site.

It will mean I will not be able to shoot from the north side anymore until the old school is down and site clear.

2022 is more looking like an opening day for the school.

Truck load of joist on site for the roof.
My drone has just volunteered to take the pictures.
 
My drone has just volunteered to take the pictures.
They are always welcome since we can't get close to most site to take shots. M3 is a good example.

Can get shots from Central Parkway, but a longer route when I do a photo tour.
 
They started on Monday and didn't have time to stop to shoot it. Was planning on doing it today, but didn't happen..

Joist in place for the roof. Once the roof in place, interior work can start.
 
March 31
with most of the roof deck in place, the roofers can come in to start sealing the roof to allow other traders then to start working inside. The side has to be clean an level around the school to allow the brick work to start on the exterior walls.

Only one section of the old school down and cleaning up that area before starting on the remaining section.

It been said that there are supposed to be some time capsizal on site for the school and to be remove this weekend.
51088489002_efeb0e8894_b.jpg

51088402176_e2aaef9a57_b.jpg

51088402366_734eaab8df_b.jpg

51088402476_f397e2a674_b.jpg

51088473469_9042b913a3_b.jpg

51088402826_73dfc0bf75_b.jpg

51088403101_45058a3492_b.jpg

51088947323_6741a50857_b.jpg

51088490312_5f18ea49f7_b.jpg

51088490452_0e2b9577c1_b.jpg

51088947503_aecf85d9a7_b.jpg

51088490592_c31b3406d3_b.jpg

51088404261_a59ebfd715_b.jpg

51088404441_ecae3070db_b.jpg

51089216230_f73dff8e1f_b.jpg

51089216645_298c44990f_b.jpg
 
May 24
Every little has been done in the last month leveling the old school site as well preparing it for the new sport field. The new school will not be ready until 2022 with the roofing being place on it now.

Block walls are being seal to allow the bricking to take place shortly.
51201548876_d581bc57ac_b.jpg

51201751523_f9b42e3142_b.jpg

51201751578_5eb6eb9c0f_b.jpg

51201751648_3bd0885113_b.jpg

51200834122_3cdc1fbac9_b.jpg

51201751763_6e9fd0fc05_b.jpg
 
The south side, east/west walls are brick with window installed. Getting ready to brick the north side.

Waterline about to be install going north to Elm Dr.
 
Aug 21
Most of the exterior brick work is done with all doors and windows in stalled excerpt for an opening on the 2nd floor on the west side. I am assuming to have material place on the 2nd floor and fill in when done.

The old site is being dug up to install new underground utilities that will connect to existing ones as well update the existing system.

School will open For The new school year Sept 2022

There are shot from Aug 4 of the north site on line
51401763554_a8bace4b5e_b.jpg

51401981915_dc741dd880_b.jpg

51401002281_4d57372425_b.jpg

51400254202_773dbc9de9_b.jpg

51401002191_faca0d5deb_b.jpg

51400254077_71c1401127_b.jpg

51401981615_e788051482_b.jpg
 

Back
Top