02/23/2024:
1.png

2.png

3.png

03/01/2024:
Balcony glass is going up at EX1.
4.png

6.png
5.png

7.png

8.png

9.png

10.png
 
I was hoping to have these up before I left for the US on Sat or post them while in the US but left the USB drive at home since I finally able to clean up my backlog.

March 5
Lot more up on my site now
53617586341_27464902ef_b.jpg

53617791973_7ac295e437_b.jpg

53617919549_311b4de962_b.jpg

53618032105_88d3f9830a_b.jpg

53618031835_da2f5f86b3_b.jpg

53617585566_4c2f3e51e2_b.jpg

53617791323_a1fe484c7d_b.jpg
 
Seems like this was a missed opportunity to put in a district heating and cooling system.
 
May 01
At the rate they are going, the 4th tower should be at grade by Aug or sooner.

More up on my site
53709004619_62f6c36910_b.jpg

53708888733_2486592e55_b.jpg

53708888793_02ee2e5975_b.jpg

53708679181_83680cc57b_b.jpg

53708678926_4c0d709046_b.jpg

53708889228_3d5924608b_b.jpg
 