Dec 16
The 60 story is top off with mechanical roof being place with the crane gone in Q1 2025. The 40 story is nearing its top off floor with the crane gone in Q1 2025 as well
133A3025.JPG
133A3026.JPG
133A3027.JPG
 
whose idea was it to put 'exchange' in big letters at the top of the shortest building 😭😭😭😭😭😭 it looks so bad
 
whose idea was it to put 'exchange' in big letters at the top of the shortest building 😭😭😭😭😭😭 it looks so bad
It can be seen from the mall as that is where the new hotel is. They may put one on the 42 story and never know about the 60 and 70 story towers. Can see the sign on the north side, but hard to see it on the southside.
 
It can be seen from the mall as that is where the new hotel is. They may put one on the 42 story and never know about the 60 and 70 story towers. Can see the sign on the north side, but hard to see it on the southside.
^This.
You likely wouldn't be able to read it on the main tower at 200m from ground level due to distance and sight lines.
 
^This.
You likely wouldn't be able to read it on the main tower at 200m from ground level due to distance and sight lines.
It would have be for distance and making a statement at 200m plus tall. I don't see it happening, but never know these days considering TD has a logo on its 160 Front St tower.

Next time you shoot the site, you will get a good shot of the mechanical roof as it was quick clear from Central Pkwy today and no chance to get a shot of it in the great sunlight.
 