Ryan_T
Senior Member
I wish the top of one cube is not blended into the bottom of another. I presume this is due to engineering requirements.
I wish the top of one cube is not blended into the bottom of another. I presume this is due to engineering requirements.
And it apparently does a good job of it too, given people can't seem to tell that it's a garage.
What is taking retail so long here?
When do I get my McD's back?
You know that has more to do with the retailers than the developer in that location. Bazis don't do the interior fit-outs of the stores. In this location, yup, I'm wondering too. It is possible that the retail spaces have been needed as storage and staging for construction materials for the residential suites and amenities, some of which may still be under construction.This developer, Bazis, doesn't have a good reputation when it comes to delivering retail,... or anything else for that matter! Bazis' EmeraldPark development was finished about 2 years ago,... yet, we're still waiting for anchor tenant Metro (still just an empty shell) and LCBO to open (interior finished but not stock):
https://urbantoronto.ca/forum/threa...-rosario-varacalli.4829/page-131#post-1147425
https://urbantoronto.ca/forum/threa...-rosario-varacalli.4829/page-143#post-1174817
You know that has more to do with the retailers than the developer in that location. Bazis don't do the interior fit-outs of the stores. In this location, yup, I'm wondering too. It is possible that the retail spaces have been needed as storage and staging for construction materials for the residential suites and amenities, some of which may still be under construction.
42
You were talking about Metro & the LCBO, not the others, which are not open there now for other reasons than what you stated. In this case, McDonalds would not have to prove anything regarding their proposed interior design. Let's leave the Emerald Park comments in the Emerald Park thread please.Many of the Bazis EmeraldPark retailers took 9 months from commitment to opening,.... about 5-6 months was waiting for Bazis (namely their almighty Jonathan Gold or whoever) to review and give their blessing on their proposed interior design,....
Gorgeous plantings at Museum House too… (nice shot!)
42