20250801_202118.jpg
 

@drum118 It looks like you and I had the same great idea hitting up a few of the Etobicoke projects last Sunday!
 
  • Like
Reactions: PMT

@drum118 It looks like you and I had the same great idea hitting up a few of the Etobicoke projects last Sunday!
Been on my do list of 100 to shoot for sometime and finally got around to do this after a few things went sideways. Couple more floors to go and should be done in November.

The great weather makes for good shooting so long you are not shooting in the direction of the sun since its a lot lower these days.
 
Nov 22
Lot more up on my site

North tower is top off at at the 6th floor with the south tower being form for the 8th lloor. The 4th floor will be for surgery as it has a higher ceiling height
54949358858_37ce1d409d_o.jpg

54949359298_0d9c00ea77_o.jpg

54949460300_ec598e7083_o.jpg

54949161026_2c5a189742_o.jpg

54949160696_f6319f77ee_o.jpg

54949359013_17133e1be2_o.jpg

54949417664_7b2240c654_o.jpg
 

Back
Top