Good point. Platform 1 is for the future once track 1 every gets built. Platform 2 being currently use as before and part of platform 1. Platform 3 would have to be for a future platform as well a future track 4 on the south side.If the numbering system is the same as Oshawa Station, all platforms are treated the same, either bus or rail. At Oshawa, platforms 1& 2 are GO Train platforms, 3,4 &5 are VIA Rail platforms and 6-16 are Bus platforms.
I believe Union is the same whereas the lower number platforms are rail, and bus platforms start in the 20s. Bays 1-3 at Cooksville I assume are rail platforms (both existing and future)