Moving along. Taken 6July.

IMG_3158.jpeg
IMG_3159.jpeg
IMG_3160.jpeg
 
Just occurred to me when looking at the first image above that for the catenary for electrification, there will be staggered poles on the overpass instead of parallel ones. cc @crs1026
 
I wonder whether they'll re-grade Wallace under the overpass once the tracks are out. I thought I recalled seeing some early elevations where the roadway was dropped by ~0.5m.
 
Having not been down lately - how is the completion of the ramps at the ends of the guideway coming along? And Paton Road ?

- Paul
 

Back
Top