This one was before Council this week; with what appears to be a settlement offer. (docs confidential).

It was adopted with an amendment:

1699554687420.png


Underlying item:

 
That'll get expensive tossing out all of those laptops from your window there Mr. C...especially if they're Apple. >.<
 
Ah there we go we're getting back to reality, now we just need one more revision (which i'm sure is coming soon enough) and we'll be back to our regular bland Toronto scheduled programming.
There we go, there's that last revision I was talking about earlier, now we're back on track to regular gutter trash condo building scheduling.
 
Post-settlement resubmission here with some changes:
  • Height decreased from 136.79 to 128.13m
  • Total residential units decreased from 446 to 421
  • Total vehicular parking increased from 139 to 151
  • Total bicycle parking decreased from 447 to 434
Additionally, Kirkor is now the primary architect (previously DIALOG).

Updated renderings:
PLN - Architectural Plans - Architectural Plans_1736-1746 Weston Road-0.jpg
PLN - Architectural Plans - Architectural Plans_1736-1746 Weston Road-151.jpg
PLN - Architectural Plans - Architectural Plans_1736-1746 Weston Road-152.jpg
PLN - Architectural Plans - Architectural Plans_1736-1746 Weston Road-153.jpg
PLN - Architectural Plans - Architectural Plans_1736-1746 Weston Road-151.jpg
PLN - Architectural Plans - Architectural Plans_1736-1746 Weston Road-152.jpg
PLN - Architectural Plans - Architectural Plans_1736-1746 Weston Road-153.jpg
 
While uncharacteristically simplified for KirKor........... it's characteristically not very appealing.

The base (grade level) could be much better, but the middle layer in the cake is just not at all good and doesn't play well w/the base or the tower.

Fix the base, increase it to 4 flloors, blend the middle layer into the tower treatment wise.

Should be do-able at very little if any net cost.
 