They will not; Emerald Park is behind HC by at least 8 months; and I doubt it will be ready before late 2014. But I agree with you--it would look great if they both were finished at the same time.
 
May 12th 2012:

- Work continues on the weekend
- The connection to Sheppard Station looks like it's 2 stories deep
- The corner square starts to form

HullMark%2520Pano%2520May%252012%25202012.jpg


It looks like they are building a walkway
DSC_0792.JPG


DSC_0793.JPG


Is this a half storey?
DSC_0794.JPG
 
Nice view! Thanks for updates! Here is a ground-level view from Yonge:

hc1pw.jpg


Back of the building, south-east corner. What you see is not three-stories but a P5 and main level split in two:

hc2ri.jpg
 
The square appears much smaller than what I was expecting. That might actually prove to be a good thing, since it won't feel as barren when empty, and it should feel more enclosed once the west side of the street gets built up
 
May 11
Again this is another project that can be best seen from the balconies or office windows until it gets up to their floor.

I only expect to take about 8 shots of this complex after I get back from Europe in Sept. Unless thing change before I leave, this is my last shots of it until I return.

More up on site
7191136392_802d59bddd_b.jpg


7191117626_da3371fc9d_b.jpg


7191183332_9cbf1cfdea_b.jpg


7191111586_4ba9673160_b.jpg


7191105294_1eb551dbcf_b.jpg


7191224562_8747f941f2_b.jpg
 
The houses south of Sheppard on Tradewind, where the extension was to go are at times up for sale.

It does not appear that they will be torn down any time soon. In fact, on another thread there was discussion that a revised intersection plan where Doris would not be extended south through the existing houses. There would be new traffic lights at Tradewind and Sheppard and a revised intersection there.

With the 88 condo at Doris and Sheppard (east corner) there may be some further delay in new street arrangements.
 