July 03
All photos now up on site

You can see a wall being built in the inbound track tunnel for the walkway that will connect to the south ramp. Without being up close, it hard to say if there will be a tunnel for the walkway as the shoring indicates there could be one or it will be for the access from the parking lot on the southside of the creek. That is a wide walkway to the right
53836242369_fdb558fa70_b.jpg

53836334400_f0c53573f7_b.jpg


New intersection now in service with the old one close and lights turn off/removed as of today
53834992212_553d6f57b1_b.jpg


This is where Mary Fix Creek goes under Hurontario and no idea at this time if it will be rebuilt and widen at the same time for the LRT since this is where the guideway will be built on the west side before moving to the centre of the road behind this shot along with a sidewalk.
53836239009_ce8244fc4e_b.jpg


Area prepared for the curb to be pour and sidewalk to the right of the poles.
53835886836_6bfa3066de_b.jpg


Existing duct bank and the curb to be pour to the left of it
53836331340_a810ab57ca_b.jpg
 

Back