I am the candidate that wrote the proposal for changing the route of the LRT in Brampton. I welcome all of your input as I am seeking to have the best route possible for Brampton. I believe that my proposal is an improvement over the other options. Other politicians are pushing for a tunnel to Williams Pkwy or for it to stop at Steeles. I will try to do a multi-quote to respond to some of you while not flooding this thread.
The McLaughlin-OBRY route may not be perfect, but neither is the current route. My aim is to get a discussion started locally about where the best route is.
It has been talked about here, but it is adding travel time to everyone as well not helping the DT of Brampton.
If Metrolinx is promoting and stops over 500m which is bad in the first place, clearly show how RR focuses they are, as well out of touch with live, play, and work areas as well making thing walkable.
The current plan shown above in the PDF is the correct way to go.
If he \ is willing to do this, then wide sidewalks, no parking and single lane of traffic.
Creating a wider sidewalk for a more complete street is one of the reasons why I proposed this route compared to the downtown alignment which would not be able to create a successful pedestrian experience due to the narrow width of the right of way. The proposed removal of local bus service on Main St is another concern with the large distances between stops.
Another politician drawing lines on a map during an election. What a classic.
As far as I know, in Brampton I am the only one to have proposed an alternate route with a map. I know Peter Robertson drew a map with the LRT heading west to Churchville, up the same rail line then across Queen St to the PMH site.
I wouldn't trust anyone who wrote "tenants" when they meant "tenets".
I'll blame that one on spell-check. I have fixed it, thank you.
that "Alternate route" would roughly double travel times in that segment, which would take a huge impact on ridership. Its a big detour. travel times from Steeles to the GO station would go from roughly 8 minutes to roughly 14 minutes. never mind the fact that it passes by even fewer redevelopment sites than the existing proposed alignment.
Plus, the additional cost of laying 2.3km of extra track is probably similar to the cost of burying it for 5-600 meters leading through the downtown core.
A section of the downtown route will run in mixed traffic. Having trains wait in traffic behind left turning cars plus waiting for the lane switch at Wellington will reduce the time difference.
There are more redevelopment sites along my proposed route. The current route services the Brampton Mall area. The rest of the route is the Historical District and a park along the Etobicoke Creek. My route gives better access to the Malta Road development (450 units), Sheridan Davis Campus, the Flower City Community Campus (65 acres & possible university site), plus redevelopment of the Queen West(aimed at 200 people plus jobs per hectare).
The cost savings of not having to replace the superstructure of the 2 Etobicoke creek bridges should go a long way to covering the cost of the extra distance. The tunnel from Nanwood to the Go station would be ~2km or $500 million at crosstown LRT cost. The cost of ~2km surface LRT is about $150 million. My route would be less as a portion would run in a rail right of way.
Where was he back in 2008 and 2009 when the route was being discussed and the current route was selected?
I was not involved in municipal politics at that time.
Not only is this guy completely out to lunch with his LRT route - because hey, why try to use rapid transit to spur development along a central corridor anyways - this proposal of his reads like it was written by a seven-year-old. Seriously, read it aloud and see for yourself how awkward it is.
Oh, and he can't figure out that LRT =/= streetcars.
Two thumbs down!
There would be little development on the part of the route that I am diverting. I'm afraid I can't do much about my writing style, but I wanted to do more than the usual bullet points and buzz words that most politicians use.
Also I said that running LRT in mixed traffic lanes would make that section
effectively like a streetcar. In that section (apart from the driver cab at either end) it would look and operate very similar to the new Toronto streetcars.