Those are the Montgomery Mills towers - they've actually sunk quite a bit of money into them in the past few years, ie all new balconies, and they redid the landscaping and entrances to be more modern.
 
Anyone know if the new pedestrian stairs to Islington will be open/accessible anytime soon? Or will it be once the third building (on the east) is done?
 
Anyone know if the new pedestrian stairs to Islington will be open/accessible anytime soon? Or will it be once the third building (on the east) is done?

The notice says 4-6 weeks but who knows really.

The trio of Montgomery mills is no more, the 2 on the northside of Mabelle are owned and managed by will-star and the south one is northstar. Northstar has a application to build 57 story building on the backside where the tennis courts are and i'm sure Wilstar will do something the large field that is the garage roof as well.

Wilstar did put some money into the buildings but it's kinda a flop, the balconies restoration started before Tridel even had a garage poured and the balconies still aren't done yet. The heating and cooling system in the buildings were replaced and the energy saving settings cause tenants to use their in unit HVAC on all the time. Winters are cold and summers are too warm and muggy, better have a portable AC and space heaters in Wilstar's place.
 
DJI_0240.JPG
 
Looks like occupancy at Bloorvista has now started on certain floors. Islington Terrace seems to be fully occupied.
 
Aug 8
More up on site.

People moving in to both towers while I was there and prospective buyers been shown the 2nd tower.

An accident waiting to happen if that unprotected edge remains as is at the bottom of the ramp that connect to the street sidewalk, especially at night.
50213148202_0c05e70d4f_b.jpg

50212878641_d76a70fd0e_b.jpg

50212878481_53d57bf296_b.jpg

50213147827_05daff199e_b.jpg

50212879216_4c85aa320c_b.jpg

50212879486_1ff8569e25_b.jpg

50212879576_2f15746895_b.jpg

50213149007_41278b5fba_b.jpg

50212351103_136d334213_b.jpg

50213149492_4bf1b4b174_b.jpg

50212880641_04d997f67a_b.jpg

50212881026_2b1fd26697_b.jpg

50212352288_bff5a9ece3_b.jpg

50213150367_9ef303f098_b.jpg

50212349098_b71ff0fabb_b.jpg

50212349013_73d0dfdcf7_b.jpg
 
???????????????????????????????????????????

50212352288_bff5a9ece3_b.jpg
The towers turned out really well, I dont know what this is supposed to be. An electrical bunker? Maybe they were going for the mechanical room look? Above ground water pumping station look? Who knows with Kirkor.
 
Islington Terrace from Tom Riley Park…

IMG_2384.jpg
IMG_2385.jpg
IMG_2387.jpg
IMG_2389.jpg


I suppose we'll see better plantings here next year, but this already a huge improvement to this rather grubby piece of sidewalk along Islington.
IMG_2390.jpg
IMG_2392.jpg
IMG_2393.jpg


The last tower under construction.
IMG_2391.jpg

IMG_2394.jpg
IMG_2395.jpg


42
 
This batch starts out looking across Mabelle Avenue…

IMG_2396.jpg
IMG_2397.jpg
IMG_2398.jpg
IMG_2399.jpg
IMG_2400.jpg
IMG_2401.jpg
IMG_2402.jpg
IMG_2403.jpg


This is from Bloor …
IMG_2415.jpg


…and finally from Islington Avenue:
IMG_2416.jpg


42
 
Those buildings are really not my thing. But they've seem to have done an okay job with it. And look fairly striking from an distance. So thumbs marginally up for these, for what's that's worth.
 
Those buildings are really not my thing. But they've seem to have done an okay job with it. And look fairly striking from an distance. So thumbs marginally up for these, for what's that's worth.

They've certainly improved the Etobicoke skyline, if nothing else - it was very tired looking with all those ugly 70's and 80's towers. They're relatively inoffensive. And those stairs are a dramatic upgrade - the original ones had a creepy, rapey vibe to them.
 
Last edited: