February 26:

20240226_122752.jpg
1000003524.jpg

1000003522.jpg


1000003517.jpg
 
I know at least some of the former fabricator's material from a different job is to be released from that yard shortly. I don't know if the material for this one was a part of that settlement, but the timing seems to be more than coincidental
There is no where for it to go.
No one is onboard yet to continue production.
They will be lucky to see this start by summer.
 
Last edited:
it's a complete mess due to the belly up of the previous facade company, installation of the glass wall stays unknown.
..but they also said, they got that all worked out now. And the installation will start the first week of this past February (I presume). So it's either unknown or just invisible to us. >.<
 
March 4: In contrast to the situation with the glass wall system, a shipment of Duravit bathroom fixtures arrived at the King Toronto site today - well before the unit interiors are being done. The shipment was offloaded from the container, and fork lifted down into the King Toronto basement for storage until needed for installation.

1000003551.jpg



1000003552.jpg


1000003547.jpg
1000003549.jpg


1000003572.jpg
 

Attachments

  • 20240304_135605.jpg
    20240304_135605.jpg
    325.6 KB · Views: 52
  • 1000003548.jpg
    1000003548.jpg
    211.5 KB · Views: 48
  • 1000003550.jpg
    1000003550.jpg
    328.6 KB · Views: 35
  • 1000003573.jpg
    1000003573.jpg
    363.9 KB · Views: 39

Back
Top