A lot more glass has arrived on site - pictures follow. But first a copy of one of the pictures in the Urbantoronto KING Toronto database entry - in answer to @UtakataNoAnnex 's question regarding the black beam, the ground and second floor retail glazing, referred to in Karldice's post above, can be seen in the lower right corner:

1728350241761.png


More photo's of the glazing materials now on site. Two different staging areas are being used, one in the King Street side of the building, the other at the south west corner of the ground floor:

20241007_172244.jpg


20241007_172301.jpg


20241007_172403.jpg


20241007_172345.jpg


20241007_174142.jpg


20241007_174416.jpg


20241007_174241.jpg

20241007_174109.jpg
 
October 9. More glazing installation, a couple of photos of second floor rough-in work, some overall pictures of the King Toronto building.

1. Glazing installation. Work seems to be going fairly slowly. Possible crew mobilization issues - an initial crew for site familiarization and working out the installation process, and / or waiting on additional staff to come free from other projects / new staff being going through the onboarding process. Hopefully something like this otherwise it is going to be a long process.

20241009_142037.jpg




20241009_161448.jpg


Contractor truck on King Street in front of the site:

20241009_143542.jpg


Second floor rough-ins:

20241009_141901.jpg


20241009_141924.jpg


East Mountain - still growing:

20241009_142321.jpg


For a work in progress - looks good in the sunshine:

20241009_142414.jpg


20241009_142316.jpg


20241009_141946.jpg

20241008_155529.jpg

20241008_155614.jpg
 

Attachments

  • 20241008_155807.jpg
    20241008_155807.jpg
    403.4 KB · Views: 37
Last edited:
Photos from Thursday and Friday, October 10 and 11. More of the glazing and cladding has been delivered - photo of a delivery in the process of being unloaded. Another section of glazing has been installed along the south perimeter wall. Overall, it still appears that mobilization for installation of the glazing is still very slow. Forming work on the East Mountain continues to progress.

20241011_095053.jpg


20241011_095109.jpg


20241011_095429.jpg


20241011_092436.jpg


20241011_094354.jpg


20241011_092952.jpg
20241011_094352.jpg
 

Attachments

  • 20241011_092845.jpg
    20241011_092845.jpg
    349.8 KB · Views: 23
  • 20241011_092857.jpg
    20241011_092857.jpg
    297.5 KB · Views: 24
  • 20241011_094417.jpg
    20241011_094417.jpg
    300.9 KB · Views: 22
How high are the chances of the sealant between the glass blocks to fail and leak? What does long term maintenance look like for glass like this?
 
The glass blocks aren't integral to anything. It's a standard curtainwall frame with blocks mounted where you'd normally have glass or a panel.

The real leaks are going to happen at all of those transitions and interfaces. Inside corners, outside corners, stepbacks, balconies...
 
October 15: Spyder crane and installation crew on site working on the first glazing section (hopefully of several) of the day - approximately 8:15 this morning.

20241015_082712.jpg


Straps on:

20241015_082854.jpg


And up we go:

20241015_083033.jpg

20241015_083138.jpg


Lots more to go:

20241015_082921.jpg


20241015_082914.jpg


I plan to get back there today for a progress update - hopefully a pickup in speed.
 
Is that one of the first of the "triangle waves" to get cladding? 🙀
 
This post covers two more updates for King Toronto, the first from 12:30 this afternoon, the second from 4:30 after the work for the day was over.

MIdday - the section of glazing that was being started this morning has now been installed, and the Spyder crane moved over to in preparation to start the second section of the day. A couple of views of the building from the south.

20241015_123327.jpg



20241015_123210.jpg


20241015_123405.jpg


East mountain looks like it has reached full height.

20241015_122803.jpg


South and East Mountains

20241015_123704.jpg


Later, at 4:30 this afternoon. Another section of glazing has been installed - makes a couple of complete sections (several panels) for the day. Lots more to be done....

20241015_170859.jpg


20241015_170920.jpg


Spyder crane moved another section to the east, in position for tomorrow's activities.

20241015_171028.jpg


20241015_165012.jpg


20241015_164957.jpg


And finally, 5 PM, another skid of cladding, staged on the ground floor just off King Street.

20241015_173325.jpg
 

Attachments

  • 20241015_123132.jpg
    20241015_123132.jpg
    267.4 KB · Views: 17