drum118
Superstar
If you look at the plan for the whole area, Subway Cr has to be close for the west side and the removal of the parking lot north of the new terminal. Then a new entrance has to be built off Dundas at Accorn Ave, along with a rebuilt the current parking lot that is to be extended north to Dundas. The current driveway to the TTC kiss and ride will be close along with the current parking for it.I'm a little confused.
http://www.infrastructureontario.ca/Financial-Close-RER-Kipling-Bus-Terminal/
The RFP was just awarded, but construction is starting so soon? Major construction and road closures next week. WSP Canada is likely the civil designer. Is there a preliminary design?
https://beta.gotransit.com/en/the-future-go/improvements/kipling
A new tunnel has to be built from the new hub to TTC Kiss & Ride first. No idea if any plans are in place to allow TTC to go underground to take the line west at a future date either to Cloverdale or the new yard that will have to go under the hub
TTC is planing on adding a 3rd trail track north of the current 2.