drum118
Superstar
A lot has taken place since I shot it.I feel it's my duty to give drum118 weekly bridge updates.
No idea what's new here, but here's the shot.
View attachment 535699
All the construction equipment is gone along of the pile of scrap from the RR bridge, and it has been cleaned up.
You can see the new pier to the right that will support the new pedestrian/cycles bridge. The pier has 3 pads to support beams on it.
Looking that the new eastbound bridge, that west pier will be to the west of the excavator or between the eastbound and pedestrian pier to angle the mouth for the new westbound bridge.
That long beam will replace that short pipe over the Don now with a lot more cable space.
You can see how much of the Don River mouth will be widened compared to what there is today.
At the same time, I could be wrong on the pedestrian/cycles bridge.as that could be used for the watermain currently on the eastbound bridge sidewalk or it will be part of the westbound bridge.
Last edited: