July 07
Took me many attempts to get back down to the area as the weather was against me when I had time since my last visit. Lot more up on my site

Was planning on shooting a lot more of the area, but after 5 hours in the heat, the sun and walking, call it a day.

Part of the north plug removed
53845224720_df465dea71_b.jpg

53845050503_30620d981e_b.jpg

53844784921_5967c0c0d3_b.jpg

53845224820_85b8fff444_b.jpg

53843895887_833cbaeff7_b.jpg

53845145149_5e348a5b12_b.jpg
 
July 07
The Don Roadway

No idea how thick the concrete base is as well how deep they went considering the area was still at grade when I last saw it
53844785106_4b70651bf1_b.jpg

53845050543_0f354c71e8_b.jpg

53845145249_2eab559b7e_b.jpg

53845145239_11009c505a_b.jpg

53844785051_2921c47b69_b.jpg

53845050318_50edf5f9e4_b.jpg
 
No idea how thick the concrete base is as well how deep they went

Rocky said the concrete piles go all the way down to bedrock along this stretch of Don Roadway to prevent it from sinking into the buried pollution there.
Final road surface level should be close to the top of the silver cylinder supports for the hydro line towers.
 
Rocky said the concrete piles go all the way down to bedrock along this stretch of Don Roadway to prevent it from sinking into the buried pollution there.
Final road surface level should be close to the top of the silver cylinder supports for the hydro line towers.
Thanks.

The road will slope from the Lake Shore to the Commissioner Bridge
 
July 07
Very slow getting the new westbound Lake Shore E built and was expecting to see more done then what has taken place. No sidewalk in place on either side as well.

Piers are being formed for the new Don River bridge and hard to say if the steel beams for the new bridge will be place on the new piers this year, but will not open until next year. Then the new intersection for the Don Roadway has to be built along with the new cycle bridge and path for it.
53844785036_9128929255_b.jpg

53845224790_075fe30acd_b.jpg

53845145164_fa8fe12fab_b.jpg

53845224895_beebf2727d_b.jpg

53845224890_9e365f3db7_b.jpg
 
Great! Who is the architect? And if I am not mistaken this might be the regional playground that WT is looking for a sponsor for?
 
Last edited:
July 07
The last of the photos for the area are online now
53846124648_e4b288ef13_b.jpg

53846297435_fcbbfff5f4_b.jpg

53846124618_63d04f3acb_b.jpg

53846124478_130c1df231_b.jpg



Small amount of the old Cherry St bridge footing still to be remove
53847767213_1d84a23cd8_b.jpg

53847767183_113310da11_b.jpg
 

Back
Top