ToroTO
Active Member
Looks very nice, almost icy without lights. Will look cool when they go with simulated underwater lighting. Just hope that something is still to be done about minimizing the look of the panel separation.
Looks very nice, almost icy without lights. Will look cool when they go with simulated underwater lighting. Just hope that something is still to be done about minimizing the look of the panel separation.
It creates very dangerous situation on the Lower Jarvis sidewalk as cars (or more often trucks) come speeding out, blind.All the folks leaving the Green P parking garage on the west side of Market heading to Lake Shore now cut through here rather than going north to Wilton. Was this somehow intentional?
They have finally started to finish off the south-facing wall that is above the railway tracks.
Track work by Metrolinx, they were upgrading the Union station switches to higher speed ones. Apparently many of the switches were still original from the mid 1920's.
Yes, but Metrolinx would not let them do any excavation or anything close to the tracks until they had finished their work on the berm - that's why the wall was not done properly from Day 1.It wasn't that at all. They had to excavate the earth away from the side of the building and build a partial retaining wall so the scaffolding could have a place to be installed. They started this in January but abandoned it due to the never ending cold.