Is this 23 or 20s?
Third crane going up. pics to follow, but it looks to be the same as the other two, and it's positioned on the south east corner of the project.
There were also engineers inspecting and uncovering capped rebar. Given that rust expands over time and would crack the pillars, I suspect some exposed rebar will be pulled put. There was a big pile of free rebar in the SW corner of the site carted away on Thursday.
Given my birds eye view...I learn things. They are soda-blasting (or sand-blasting) the exposed rebar, removing the rust.
This one's gonna rise fast.
Once the existing rebar is done priming, the pouring can begin. And even if the first few floors go slowly, it'll probably top out in about 6 months.
Doors open in 12 perhaps?
Their July 26 2011 Press Release seems to disagree with you. MaRS Centre Phase 2 will be developed and operated by MaRS and has an anticipated completion date of September 2013.
Back to normal here, it's like they never left.