June 20, 2020

20200620_120344.jpg
20200620_120357.jpg
20200620_120436.jpg
20200620_120507.jpg
20200620_120540.jpg
 
Looks like they've reached grade level roughly throughout the entire site. While forms on the NE corner at Bathurst & Bloor, have reached the 2nd level at its highest point.
 
Was having a look through the plans from the development application site and I hadn’t realized that one of the facades would be using glass block, which is a great tie in to Westbank’s King project. I’m wondering if they’ll be using the same kind of system/blocks here, and if it will be a good indicator of what the cladding at King will end up looking like.

0E3AAD83-F8BD-409F-9672-EE36B25A43C3.jpeg

8AB2F17D-ED5E-4BE2-BAF0-6223BDAF22A9.jpeg

09BE442D-9257-44AC-B7D1-E9A0ADF92534.jpeg
 
Ooooh is that raw concrete I see on the right side of the second image? Will it be cast in place, or is that too much to ask for?
 

Back
Top