84C0A130-7B99-4E75-8080-32F6412FF7A3.jpeg
6A13F743-78C0-4BA3-AECA-037D1D337B3E.jpeg
 
33 Parliament GOODE was granted Conditional Permit, Partial Permit - Shoring yesterday and haven't yet started demolition of existing hangar. Let's hope the city pushes that button for 31 Parliament soon and removes the refusal notices on all permits and under review on shoring.

under.JPG
 
I moved a bunch of posts today to The Goode Condos thread, but I'm leaving the above here. Here's the deal: the trench is the dividing line between The Goode and No 31, The Goode being to the north and No 31 to the south. Work has started on The Goode site, but not really at No 31 yet. So, if you have photos of work in the coming weeks at this site, please post it in The Goode Condos thread!

42
 
Finally the Shoring can begin. Partial Permit - Shoring. Stopped in on my way by at 1pm today. The site supervisor introduced himself during the demolition of previous buildings and he's onsite today with a huge crew. They still haven't announced ground breaking but things are moving forward.


Shoring Permit.JPG
 
Last edited:

Back
Top