April 10
more on site. Unless something changes soon, only a single level of underground parking, not the 5 level call for.

As for move in date, don't see September dates unless in the townhouses and it would be for the south end only.
6954896776_19e29a0100_b.jpg


7100959041_3476865826_b.jpg


6954890356_aab0807c0c_b.jpg


7100961947_17d2cf38a7_b.jpg


7100960329_a666cca8e1_b.jpg


7100958449_fb2597ba54_b.jpg
 
April 21 2012 update

One Valhalla ... Towns:
IMG_3638.jpg


One Valhalla ... Tower 1:
IMG_3639.jpg
IMG_3640.jpg
IMG_3641.jpg
IMG_3643.jpg


Liking the dark grey spandrels here ...

IMG_3642.jpg
 
Scaled Model

Tower 3 (Triumph) is shown to be 25 storeys:
IMG_3649.jpg
IMG_3650.jpg



The overall One Valhalla development:
IMG_3645.jpg
IMG_3646.jpg
IMG_3647.jpg
IMG_3648.jpg
 
If you look at my April 10 photo and look at Solaris of the south townhouse siding, all one colour now with the lighter colour been used.

I was sure the week before when I went by it was Blue and surprise to to see what I saw when I shot it. It was not the blue shown on the plywood, but a dark blue. Not sure if it painted material or metal siding, but looks metal to me.

Even though the area to the west is open, the underground area built now can be block off as well at grade so people can move in late fall this year.

They are only building tower 2 now and still have to excavate the south end for tower 3. Since the fencing has been moved back 10m, cannot get a shot of the 2nd tower base and area around it at this time.
 
So the building that's nearly topped out right now is tower 2? Will that be the shortest of the three towers?
 
So the building that's nearly topped out right now is tower 2? Will that be the shortest of the three towers?

No that tower 1 from my point of view.

Tower 2 is to the left and in the centre next to 427 and it will be the tallest.

Tower 3 is on the south end, next to the south townhouses and where the dirt is in my photo 3 or left of the car in my last photo.

This photo shows the foundation of the 3rd crane for tower 2 that I post earlier this year.
6598826485_434c086976_b.jpg
 
i assume after edilcan sells out phase 3, they are gonna continue selling more of towns and condos on the south side of the lands that edilcan just purchased it. i wonder what edilcan has in store for these lands, but overall seeing valhalla context, i have no doubts it will continue nicely. it is finally relief to see etobicoke is starting to pick up new developments on hwy 427, between bloor and rathburn.
 
wow phase 2 is coming along faster than anticipated. i assume after building the floors on phase 2, they will go ahead start with phase 3. i expect all will be completed by early 2014, really faster than Tridel that is just opposite of Valhalla.
 
May 04
Took a 360 walk around the project from both sides of 427 before and after my meeting.

The underground parking roof will be in place by June.

The North Townhouse will be fully brick by next week and the rest of the tower by June.

The owners of the townhouses should start moving in before the year is over.

Tower 1 is cap, excepted for a small section and that should be finish next week.

Tower 2 should have its 2nd floor by June.

Excavation still has to be done where tower 3 is to go.

Crane tower 1 & 2 should be gone by July or sooner with one of them being move to where tower 3 is to go.

There is about 75 shots up on site from today shooting.
6997600288_e0b031c20a_b.jpg


7143675595_3bf18708af_b.jpg


7143665287_87e33831d4_b.jpg


6997557444_4a38e1a8da_b.jpg


7143628715_5a962af03f_b.jpg


6997518172_6abdfeb4b4_b.jpg


6997499856_48d733a195_b.jpg
 
Thank your posting the new photos drum118 and urbandreamer! Yes, comparing the latest shots to the once that were taken a few weeks ago, it doesn't look like they made too much progress on the exterior. Maybe the focus is the completion of townhomes. I wonder if there will be another delay in occupancy dates.
 