TheTigerMaster
Superstar
Metrolinx is providing $7.4 Billion in funding, so no. That's enough to built from Downtown to Eglinton or from Dundas West to Pape via Downtown. If the City of Toronto can produce another $900 Million then the entire DRL from Dundas West to Eglinton via Downtown can be built.
Downtown Rapid Transit Expansion Study
Last edited: