I personally found the TTC part a bit boring since it was basically a public consultation about how they should do public consultations, and the long detailed speech about the long process they have to go through.
My one question for them was that is the study area limited to east of University or is it possible that phase 1 could end west of University at say Spadina. I did get my question answered, the answer is yes, it is possible that it could end at Spadina or west in phase 1.
With regards to the Metrolinx part, I thought it was good that they're looking at the short and medium term ideas since the DRL will take so long to finish (they said 8-10 years construction after a few more years of study, I think). Increasing GO service and routing more buses downtown instead of to the subway lines were good ideas.
Overall, not much detailed info, it was very preliminary very early stuff.