W. K. Lis
Superstar
Elevated made sense on Eglinton from Laird to at least Bermondsay, and maybe even all the way to Kennedy.
I don't think it made sense for a B-D extension to STC along McCowan.
For Ontario Line, it makes sense north of Don Valley (i.e. Millwood Bridge), but not south of it.
The problem is that cut-and-cover is not considered, thus the option with all the benefits of underground without the huge costs - are not considered.
Has anything been released on what's happening on Eglinton West?
Cut-and-cover is fine when the tunnels are close to the surface. The problem is the vibration from the trains. We can experience that especially along Line 2, where they used cut-and-cover on most of the route. We can feel the train as they pass underneath.
From link.
The Relief Line designers figured deep tunnels would help combat the vibration and noise. Then Doug Ford, in his almighty "wisdom" decreed that noise and vibration can be ignored.