generalcanada
Senior Member
did some quick gmaps math. looks to be about 6/16km including both the GO corridor as well as the don valley crossing.How much of the Go line corridor above ground section accounts for the overall length of the line in KM ?
Is the Ex portal outside of the station?
2.5 from don yard to carlaw portal and 3.5 from the minton portal to don mills