I'm really curious to see the staging plan here and how the main station structure is going to be built over the active GO station.

Same! I live real close so I'll be on top of it with very frequent updates including drone shots.
 
I'm really curious to see the staging plan here and how the main station structure is going to be built over the active GO station.

Maybe it'll be built to the north and they'll push it to the south over the tracks?
That's how the Liege Station in Belgium was built.

 
Last edited:
Long-term hoarding is being installed North of the portal site (between Hanna and Pirandello St).

Photos starting just east of King West Laneway heading westward to the foot of Pirandello St.

Z8P_4395.jpg
Z8P_4398.jpg
Z8P_4402.jpg
Z8P_4404.jpg
Z8P_4408.jpg
0001.jpg
0002.jpg
 
April 25
They need to update the GO Station map for the rest of the year since there is no streetcar service currently as well as the 63 running in both directions now.

Be lucky to see TTC streetcars south of the loop by 2030 at the rate things are going. Got to replace the Dufferin bridge first that is supposed to be schedule in 2027 if I am not mistaken.

I notice the north GO track is higher than the original corridor today

The new tunnel extension is haft the width of the existing one and will be a bitch for events at the EX to to get to/from, let alone during the EX.

Lot more photos up on my site.