July 26, 2024

Might not be the right thread.

Need a second confirmation on the following.

This is supposed to be an emergency exit between King/Bathurst station and the Exhibition station.

02FB1105-3299-4115-AEDE-04E0041C294D.jpeg



B1EBFE31-2CA8-4F60-9FF9-10860A5ED9B6.jpeg



9673D594-1C41-41AE-BD03-4F34ACECB068.jpeg



5BE1506A-089F-4EF2-BA1B-2D9C1A962907.jpeg



F1ECB33C-2426-45B2-8EB8-178597C60F27.jpeg



AECAE8C9-01BB-4F7A-976B-3D4B19F11D52.jpeg



B8A5B3BE-C994-4A27-9489-C68C0DAE8C1D.jpeg



BF6C49E8-FEB7-49FE-BB05-C38AC3FCF928.jpeg



BDDEB975-69FA-495F-BF1A-1CEFC9105120.jpeg



E407863C-183A-4E5E-842E-8D791296629A.jpeg
 
July 26, 2024

Might not be the right thread.

Need a second confirmation on the following.

This is supposed to be an emergency exit between King/Bathurst station and the Exhibition station.

View attachment 583516


View attachment 583517


View attachment 583518


View attachment 583519


View attachment 583520


View attachment 583521


View attachment 583522


View attachment 583523


View attachment 583524


View attachment 583525
Yes, that's the Ordnance Park triangle EEB, once complete the area will be incorporated into the rest of the park
 
I watched two of the "curved" beams being craned up by one end and they curved even more until the far end left the ground and then they gradually straightened.
They are now in place vertically in the centre of the Bathurst Street side.
I think when the remaining "curved" beams are vertically installed you will find nothing but straight posts.
Let me know if I'm wrong!
(And next time you're in the area why not ask the iron workers about it, they're the experts).
 
July 27: The north side of King Street project is moving very quickly. Both the side (north-south axis) girder structures are now largely complete. The first two photos are from Friday mid-day, and the rest are from today (Saturday afternoon, around 3:45 PM) - the Saturday crew still working.

Friday:

20240726_120040.jpg


20240726_120030.jpg


Saturday:


20240727_151304.jpg


20240727_151433.jpg


20240727_151729.jpg
20240727_151514.jpg


20240727_151539.jpg
 
July 27: The north side of King Street project is moving very quickly. Both the side (north-south axis) girder structures are now largely complete. The first two photos are from Friday mid-day, and the rest are from today (Saturday afternoon, around 3:45 PM) - the Saturday crew still working.

Friday:

View attachment 583931

View attachment 583932

Saturday:


View attachment 583934

View attachment 583936

View attachment 583933View attachment 583935

View attachment 583937

Is this the station structure or are they assembling a gentry crane or something?
 
August 7 - Clifford Heritage Restorations on site today, along with a shiny new piece of their equipment. Normally one might not expect them back until time to work on the restored facades, closer to completion, but... Apparently, some of their stabilizing framework on the south side front facade has turned out to be in the way of a non-Ontario line contractor's activity. So Clifford is back to facilitate whatever needs to be done.

South Side:

20240807_122424.jpg


20240807_122448.jpg


North Side:

20240807_122516.jpg


20240807_122531.jpg
 