March 03
They removed the las excavator today as it was sitting on the trailer and the large mobile crane was placing containers onto another trailer.

It taken them a long time to get 2 floors for the west tower built and pour as though they had no permits to go above grade. Some real larger duct banks on the westside of the west tower and not sure if it for this tower or all 4 towers. By year end, the first tower should be top off.

More up on site
51007040042_ca80cef562_b.jpg

51006227308_b0a309cc3d_b.jpg

51007040507_a7745e4e40_b.jpg

51006227738_c7d81baf4b_b.jpg

51006227888_012a99467d_b.jpg

51006228143_48342ec005_b.jpg

51006935971_38b250930a_b.jpg

51006228533_71cc44c048_b.jpg

51007041547_4081f7a1c8_b.jpg

51007041872_a4ab5a7b0c_b.jpg

51007041957_02814a9240_b.jpg

51007042022_4d12a685e7_b.jpg

51006936816_b3fc6fc09b_b.jpg

51006936956_a7cfea2c0a_b.jpg

51006937276_7793992e1d_b.jpg
 
March 03
They removed the las excavator today as it was sitting on the trailer and the large mobile crane was placing containers onto another trailer.

It taken them a long time to get 2 floors for the west tower built and pour as though they had no permits to go above grade. Some real larger duct banks on the westside of the west tower and not sure if it for this tower or all 4 towers. By year end, the first tower should be top off.

More up on site
51007040042_ca80cef562_b.jpg

51006227308_b0a309cc3d_b.jpg

51007040507_a7745e4e40_b.jpg

51006227738_c7d81baf4b_b.jpg

51006227888_012a99467d_b.jpg

51006228143_48342ec005_b.jpg

51006935971_38b250930a_b.jpg

51006228533_71cc44c048_b.jpg

51007041547_4081f7a1c8_b.jpg

51007041872_a4ab5a7b0c_b.jpg

51007041957_02814a9240_b.jpg

51007042022_4d12a685e7_b.jpg

51006936816_b3fc6fc09b_b.jpg

51006936956_a7cfea2c0a_b.jpg

51006937276_7793992e1d_b.jpg
At this rate, do you think tower 2 will finish by summer 2022?
 
At this rate, do you think tower 2 will finish by summer 2022?
Yes, but not for move end.

You may see it at grade by June and top off 41 weeks later
 
By grade do you mean at ground level for June 2021 and then at top off 41 weeks later?
yes.

Once at grade, thing go fasters depending the the floor slab that normal take a week to do.
 
Is it possible after tower 1 is complete, the crane for tower 1 could be used to help Tower 2 out along with tower 2s own crane, to speed up the process?
 
Is it possible after tower 1 is complete, the crane for tower 1 could be used to help Tower 2 out along with tower 2s own crane, to speed up the process?
Even if the sweep of the boom reached the next tower, it would be highly unusual to use a crane positioned in the middle of one tower to be used for an adjacent one: the further from the crane's mast a load is hoisted, the less the crane can carry.

42
 
Even if the sweep of the boom reached the next tower, it would be highly unusual to use a crane positioned in the middle of one tower to be used for an adjacent one: the further from the crane's mast a load is hoisted, the less the crane can carry.

42
What does sweep of the boom mean? Also if that is the case, wouldn't it make more sense to set up the crane between towers instead of in the middle of each tower? That way the cranes can properly reach 2 towers each, and only 2 cranes needed for 3 towers.
 