I'm sure this has come up a million times, but--when are they starting construction on the buildings south strip of the lot?
I assume you mean the strip between Mill Street and the rail corridor. Originally this was supposed to be where the central heating plant and a school. were to go. Despite most of the site having piping installed they gave up on the central heating idea and I have heard nothing about other uses for that part of this strip. The school is still 'on the books' and when new condos are built in St Lawrence the developers now have to tell prospective owners that the local schools are 'full'. I assume that the TDSB are 'looking at it'.I'm sure this has come up a million times, but--when are they starting construction on the buildings south strip of the lot?
I assume you mean the strip between Mill Street and the rail corridor.
I'll also point out that the idea of a dedicated pedestrian/cycling bridge didn't come out of nowhere -- it's actually in the West Don Lands precinct plan (see p. 25; warning, big PDF). Clearly the planners also recognized the need for this link. Hardly a "waste" of money, though that doesn't mean it's going to get built, because apparently in Toronto we only write blank cheques for elevated expressways... but I digress.
Not to beat a dead horse, but are you aware that there was already a pedestrian access from Eastern to St Lawrence when these plans were drawn up? The old ramp was rebuilt slightly east because it conflicted with the extension of Lower River Street into the WDL. If you don't believe me, have a look at the old Street View images from the flyover on Eastern and also from St Lawrence. There's always been a pedestrian/cyclist ramp from Eastern. It's terrible infrastructure, though, and the master plan recognizes that nobody wants to walk or bike on a highway overpass. Thus the plan for a proper crossing that you pooh-poohed so thoroughly.Yeah, lots of changes since May 2005. Like, they built the bike ramp up to the Eastern flyover that was not in your .pdf, for example. I expect that they did that rather than a completely separate bike bridge to nowhere. A nowhere that'll someday be a somewhere, but not any time soon.
Not to beat a dead horse, but are you aware that there was already a pedestrian access from Eastern to St Lawrence when these plans were drawn up? The old ramp was rebuilt slightly east because it conflicted with the extension of Lower River Street into the WDL. If you don't believe me, have a look at the old Street View images from the flyover on Eastern and also from St Lawrence. There's always been a pedestrian/cyclist ramp from Eastern. It's terrible infrastructure, though, and the master plan recognizes that nobody wants to walk or bike on a highway overpass. Thus the plan for a proper crossing that you pooh-poohed so thoroughly.