ushahid
Senior Member
They have year-round LED lights on the crane for the new Four Seasons here in Boston - it creates a nice dynamic which I'd like to see more often
love Boston. love visiting Boston.
They have year-round LED lights on the crane for the new Four Seasons here in Boston - it creates a nice dynamic which I'd like to see more often
Then why is this listed as being 95 stories in the thread title?
I believe this thread is for the whole complex, with the height of the tallest tower being listed.
Perhaps it should be split once the other phases launch, similar to M City in Mississauga.
The thread currently represents the whole development. I could see us potentially separating off another thread for the commercial buildings south of Harbour Street once they get going. UT members historically have posted images of multi-phase projects in one thread unless there's something obvious separating them, a physical barrier like a street for example, so I'd be surprised if we split apart the thread for the three connected residential towers on the north side of the block. At M City, the towers are on different blocks. We're just keeping M1 and M2 in one thread as they are going up simultaneously and are the same design.Thread is for the full complex, unsure how soon they'll be starting the next phase - may end up being a site similar to The Well where multiple towers are being built at once.
^ Great pics. They should really lose that Yonge off-ramp and build on that triangle of land.
Should happen, per the Lower Yonge Precinct Transportation Master Plan. At least EB Jarvis off ramp relocated to west of Yonge, and EB Bay on ramp removed.Or get rid of both it and the Jarvis off-ramp as well, replace the Jarvis ramp with a Yonge ramp, and turn the area south of a straightened Lake Shore into a public square.
Could happen.
42
Exactly!Should happen, per the Lower Yonge Precinct Transportation Master Plan. At least EB Jarvis off ramp relocated to west of Yonge, and EB Bay on ramp removed.