This tower topped off real fast in my opinion! The others will too as soon as they pass the podium section!
 
The building looks downright naked without the jump forms crowning the top. Kinda sad that the building has topped out now.

Well, now onto waiting for Phase 2 Sky Tower to get going and reach ground level. I'm sure we'll see that one race to the top just as fast as Prestige did in the last 2 years, except this time it'll be a hella lot higher!
 
Screenshot_20211005-154933_Instagram.jpg

 
Pinnacle has just hired Amir Remtulla to lobby in regards to this project, specifically about a PATH connection.

Hmmmm

From the Lobbyist Registry:

Details for Subject Matter Registration: SM32400​


Decision(s) or issue(s) to be lobbied

PATH Connection at 1-7 Yonge Street

There's a path connection in the plans now, is there not?
 
Pinnacle has just hired Amir Remtulla to lobby in regards to this project, specifically about a PATH connection.

Hmmmm

From the Lobbyist Registry:

Details for Subject Matter Registration: SM32400​


Decision(s) or issue(s) to be lobbied

PATH Connection at 1-7 Yonge Street

There's a path connection in the plans now, is there not?

There is -- but in this report from last year, it says that "The suitability of the above-grade PATH connection relative to the City's public realm objectives for the waterfront area" is an issue yet to be resolved. Maybe the lobbying is related to that.
 

Back
Top