Toronto Model 12-05-23 One Yonge.png
 
Just now. That transfer slab sure is huge. There are also some interesting slanted columns appearing on top of the transfer slab.

View attachment 524824
I just realized those slanted columns at the corner must be for the vertical white line feature of the building that runs up the sides - very interested to see how that element turns out!
 
Now to see if pace begins to pick up with the entire transfer slab poured, though I think it may take at least three floors for them to get a system down, but that will start to define the shape of the tower by that point. Here's looking forward to watching this go up as the one has and soon forma

PS. Also, now that that slide is curing, they can take out the supports from lower floors and begin fitting them out
 
  • Like
Reactions: AHK

Back
Top