Some interesting angles showing on the floorplates on the east side, and some new red frames going in on the formwork on the top floor.

PXL_20240207_165744275.jpg
 
I'm curious about these red additions above the wall framing. Anybody know what they are for?

View attachment 539333

They are there so one face of the wall form can open for any work that needs to be done, now all the sheer walls will be "self climbing" so the crane no longer needs to be used to put in place/taken out.

Not sure if it's true but this forming company is the first in Canada to use this system.

Also weather permitting, the crane climber installation is also planned for this weekend.
 
Those kinks on the east side and the canted columns extending to the south side - promising, but let's see if they're going to be too subtle ...
 