March 13: Two crews working on different areas of the roof:

1000003691.jpg


1000003690.jpg


1000003688.jpg

1000003689.jpg
 

Attachments

  • 20240313_111613.jpg
    20240313_111613.jpg
    357.5 KB · Views: 50
March 26 - and much work going on at Portland Commons, so a number of pictures. A general comment - one of the last activities in a construction project is installation of the ground floor level glazing. It is generally not done earlier in the construction process as it would interfere with staging of construction materials on the site, and iteh ground level glass would be very much at risk for breakage. As a sign of progress, the ground level glazing has now been completed around the entire building.

Major areas of activity are:

1. South side along Front Street - sidewalk is being poured. Ground floor level glazing is in place
2. Portland Street side - again ground level glazing has now been completed, as has the sidewalk. A number of glazing sections are staged along the sidewalk for installation elsewhere in the building.
3. Roof areas - several groups of workers busy on the roof terraces in different areas of the building.
4. Over the past weeks there have been a series of dump trucks parked on Portland Street, and slowly filled by a skid loader. On asking where all this earth has been coming from - there was no visible sign of excavation around the new building - the answer was that in one of the existing buildings a new spa was being built, with a basement area being dug out for pools. No sign of any specific permits for this, either on the Wellington West side or the 510 Front Street building. The final photo is of a dump truck receiving a fill from the skid loader

20240326_150825.jpg

1000003964.jpg

1000003959.jpg

1000003955.jpg

1000003958.jpg

1000003956.jpg


1000003961.jpg


1000003963.jpg


1000003962.jpg


1000003969.jpg


1000003967.jpg


1000003966.jpg


And excavation for the spa pools in the basement:

20240326_104204.jpg
 

Attachments

  • 1000003957.jpg
    1000003957.jpg
    309.6 KB · Views: 48
From yesterday, April 18. Work on the rooftop terraces and on the Front Street sidewalk areas. The sidewalk work has been going on for quite a time - will be much better for the Front Street pedestrian traffic when completed. Starting with an overview photo of the full site. Hopefully the shipment of replacement sections for the damaged cladding and glazing pieces will arrive soon.

1000004141.jpg


1000004143.jpg


1000004142.jpg


1000004146.jpg


1000004144.jpg


20240418_160825.jpg


1000004140.jpg


1000004139.jpg
 

Attachments

  • 1000004145.jpg
    1000004145.jpg
    219.6 KB · Views: 33
May 2. Still a lot of construction material staged along the Front and Portland Street perimeter of the new Portland Commons building. The rooftop patios are taking shape - should be a real attraction for the tenants, when any of the space in the building finally gets leased.

1000004501.jpg



1000004499.jpg


Two of the rooftop terraces:

1000004502.jpg


20240502_171711.jpg


Two from Victoria Memorial Square:



1000004498.jpg


1000004497.jpg


Front Street sidewalk area:

1000004496.jpg


1000004494.jpg


1000004495.jpg
 

Attachments

  • 1000004500.jpg
    1000004500.jpg
    429.6 KB · Views: 29

Back
Top